110/10 KV
-
Verkiai, Lithuania
Client: AB „Litgrid“
Year: 2014 – 2016
Reconstruction of 110/10 KV transformer substation in Verkiai. Preparation of working project; major construction of the entire transformer substation by replacing the 110 KV equipment.