CONSTRUCTION OF TINGSRYD TRANSFORMER SUBSTATION IN SWEDEN

  • 50/10 KV
  • Tingsryd, Sweden

Client: AB “Siemens”
Year: 2016-2017

Construction of Tingsryd 50/10 KV transformer substation in Sweden: installation of 50 KV equipment, installation of 10 KV equipment, installation of power and control cables.